Gold CIP process adsorbs gold from cyaniding pulp by active carbon including 7 steps: leaching pulp preparation, cyaniding leaching, carbon adsorption, gold loaded carbon desorption, pregnant solution electrodeposit, carbon acid regeneration, and leaching pulp.
There are two kinds of ore suitable for the gold CIP system: one is flotation gold concentrate, amalgamation, and gravity tailings; the other is mudded oxidized ore.
1.High Efficiency: When the grade of gold-loaded carbon reaches 3000g/t, the desorption rate can reach more than 96%.
2.Fast: Due to the high temperature and pressure, the time of desorption electrolysis is 12 hours shortened by 50-70%.
3.Low energy consumption: Due to the same temperature and fast working, the energy consumption is 1/2-1/4 of the regular system.
4.No cyanide: Without adding NaCN in desorption solution, low cost and no pollution.
5.High-grade gold mud, extract gold mud easily.
6.Automatic control: Installed level liquid control system, temperature control system, automatic control system.
7.Safety: With three security measures, system intelligence, automatic limit pressure, and pressure release mechanism, safety valve.
Contact Us & Get a quote now
Email: GROUPXKJ@gmail.com
WhatsApp: +8613253332091
Factors affecting the grinding and classification process of ball mill
2025.04.28Analysis on the application of tin ore mining and beneficiation methods and equipment
2025.04.27What is the relationship between lithium ore ball mill working efficiency and production capacity?
2025.04.26How to choose ball mill steel balls
2025.04.25